The Construction Organisation of South Central Railway came into being with the formation of SCR on October 2, 1966. The organisation executes construction projects on entire South Central Railway, covering the states of Andhra Pradesh, Karnataka, Maharashtra, Madhya Pradesh and Goa.
Construction of bridges over River Godavari and River Krishna, besides doubling works have been the major achievements of this department. A major boost to construction activities was given when the Railways, in consultation with the Planning Commission, decided to give a thrust to Gauge conversion – from Metre Gauge & Narrow Gauge to Broad Gauge - by taking up Project Uni Gauge in 1992.
Achievements in the recent past are
Projects completed from 1987 onwards
| |||
Sl.No.
|
Name of the work
|
Length in Km
|
Year of completion
|
New Lines
| |||
1
|
Nalgonda - Miryalaguda
|
37.68
|
1988-89
|
2
|
Miryalaguda - Nadikudi
|
38.31
|
1989-90
|
3
|
Sanatnagar-Moula ali
|
22.00
|
1991-92
|
4
|
Adilabad - Pimpalkutti
|
20.37
|
1991-92
|
5
|
Telapur-Patancheru
|
8.35
|
1992-93
|
6
|
Peddapalli - Karimnagar
|
35.52
|
2000-01
|
7
|
Bagallkot-Bijapur (MG)
|
5.94
|
2000-01
|
8
|
Pendekallu - Gooty
|
29.00
|
2001-02
|
9
|
Latur Road yard - Diversion of M/L
|
3.30
|
2003-04
|
10
|
Kakinada-Kotipalli
|
45.00
|
2004-05
|
TOTAL
|
245.47
| ||
Gauge Conversion
| |||
1
|
Guntur-Macherla
|
130.73
|
1990-91
|
2
|
Manmand-Aurangabad
|
113.17
|
1991-92
|
3
|
Guntur-Guntakal
|
347.61
|
92-93 to 97-98 in phases
|
4
|
Parli-Parbhani-Aurangabad
|
240.88
|
1992-94 in phases
|
5
|
Bellary-Rayadrug
|
53.36
|
1993-94
|
6
|
Secunderabad-Falaknuma-Mahbubnagar
|
112.98
|
1993-94
|
7
|
Secunderabad-Bolarum
|
13.85
|
1993-94
|
8
|
Parbhani-Purna-Nanded
|
58.94
|
1994-95
|
9
|
Miraj-Londa
|
188.75
|
1994-95
|
10
|
Nanded-Mudkhed
|
22.49
|
1995-96
|
11
|
Hospet-Gadag-Hubli
|
143.22
|
1995-96
|
12
|
Hospet-Swamihalli
|
58.87
|
1995-96
|
13
|
Alnawar - Ambewadi
|
26.03
|
1995-96
|
14
|
Gundaroad-Kotturu
|
49.78
|
1995-96
|
15
|
Hubli-Londa-Castle Rock
|
114.93
|
1995-96
|
16
|
Secunderabad Chord line
|
1.66
|
1995-96
|
17
|
Kulem-Vasco
|
57.83
|
1997-98
|
18
|
Hotgi-Bijapur
|
93.94
|
1997-98
|
19
|
Guntur-Nallapadu
|
5.00
|
1997-98
|
20
|
Mahbubnagar-Dronachellam
|
184.14
|
1998-99
|
21
|
Castlerock-kulem
|
20.21
|
1999-2000
|
22
|
Mudkhed - Dharmabad
|
50.00
|
2001-02
|
23
|
Dharmabad - Nizamabad
|
40.00
|
2002-03
|
24
|
Janakampet - Bodhan
|
20.00
|
2002-03
|
25
|
Katpadi - Pakala-Tirupati
|
104.00
|
2003-04
|
26
|
Bolarum - Manoharabad
|
27.00
|
2003-04
|
27
|
Nizamabad-Manoharabad
|
120.00
|
2004-05
|
28
|
Adilabad-Kinwat
|
45.00
|
2004-05
|
TOTAL
|
2444.37
| ||
Sl.No.
|
Name of the work
|
Length in Km
|
Year of completion
|
Doubling
| |||
1
|
Jangaon-Pindial
|
39.48
|
1987-88
|
2
|
Hussainsagar-Hafizpet
|
13.50
|
1987-88
|
3
|
Vikarabad-Rukmapur(UP)
|
32.87
|
1988-89
|
4
|
Rukmapur-Dharur(DN)
|
10.52
|
1988-89
|
5
|
Gudur-Kondagunta
|
9.575
|
1988-89
|
6
|
Marichethai-Matmari
|
7.22
|
1990-91
|
7
|
Nancherla-Guntakal
|
9.10
|
1990-91
|
8
|
Nalwar-Thangundi
|
16.06
|
1991-92
|
9
|
Chegunta-Krishna
|
9.29
|
1991-92
|
10
|
Raichur-Marichettal
|
9.81
|
1991-92
|
11
|
Kosgi-Kuppal
|
13.61
|
1991-92
|
12
|
Hyderabad-Hussainsagar
|
5.20
|
1991-92
|
13
|
Telapur-Shankarpalli
|
17.09
|
1991-92
|
14
|
Mantatti - Nawandgi
|
8.96
|
1991-92
|
15
|
Sulehalli - wadi
|
9.18
|
1991-92
|
16
|
Thangundi-Chegunta
|
43.40
|
1992-93
|
17
|
Shankarpalli - Vikarabad
|
28.43
|
1992-93
|
18
|
Tandur-Mantatti
|
8.49
|
1992-93
|
19
|
Seram-Kurgunta
|
8.20
|
1992-93
|
20
|
Seram-Malkhaid Road
|
12.40
|
1993-94
|
21
|
Sulehalli-Chittapur-Malkhaid road
|
15.68
|
1994-95
|
22
|
Tandur-Rukmapur
|
10.88
|
1994-95
|
23
|
Nawandgi-Kurgunta
|
7.55
|
1994-95
|
24
|
Srikalahasti - Rachagunneri - Yerpedu
|
13.65
|
2001-02
|
25
|
Yerpedu - Renigunta
|
9.57
|
2002-03
|
26
|
Kondagunta-Venkatagiri - Srikalahasti
|
50.43
|
2003-04
|
27
|
Yermaras-Yadlapur
|
14.50
|
2003-04
|
28
|
Bellary-Tornagallu
|
32.00
|
2004-05
|
29
|
Renigunta-Tirupati
|
10.00
|
2004-05
|
30
|
Vijayawada - Krishna Canal(III line)
|
5.05
|
2004-05
|
TOTAL
|
481.70
| ||
MMTS
| |||
1
|
Lingampalli-Secunderabad
|
2003-04
| |
2
|
Secunderabad-Falaknuma
|
2003-04
| |
ROB/RUBs completed from 1999 onwards
| |||
Sl.No.
|
Name of ROB/RUB
|
Location
|
Year of completion
|
Cost sharing works
| |||
1
|
ROB at Fatehnagar between Begumpet - Sanatnagar
|
In lieu of LC No.28
|
1999
|
2
|
ROB at Ghatkesar
|
In lieu of LC No.16
|
2000
|
3
|
ROB between Timmapur and Shadnagar
|
In lieu of LC No.23
|
2000
|
4
|
ROB at Ramakrishnapuram Gate
|
In lieu of LC No.252
|
2001
|
5
|
RUB at Secunderabad near Rail Nilayam
|
RUB No.251
|
2001
|
6
|
ROB between Hubli-Unkal at Ashoknagar
|
In lieu of LC No.284
|
2002
|
7
|
ROB between Palakollu-Gorintada *
|
In lieu of LC No.23
|
2003
|
8
|
ROB at Chirala
|
In lieu of LC No.244
|
2003
|
9
|
RUB at Bhadrachalam Road
|
In lieu of LC No.18 KK
|
2004
|
10
|
ROB at Narasaraopet
|
In lieu of LC No.285
|
2004
|
11
|
ROB at Mahboobabad
|
In lieu of LC No.82
|
2004
|
12
|
ROB at Hafizpet
|
In lieu of LC No. 26
|
2004
|
13
|
ROB at Madhira
|
In lieu of LC No.22
|
2004
|
14
|
ROB at Pericherla
|
In lieu of LC No. 306
|
2005
|
15
|
ROB at Khammam
|
In lieu of LC No.104
|
2005
|
16
|
ROB at Zaheerabad
|
In lieu of LC No.30B
|
2005
|
Deposit works
| |||
1
|
ROB between Aurangabad-Paithan Road
|
In lieu of LC No. 52
|
2000
|
2
|
ROB between Eluru and Denduluru
|
Km 490/15-491/1
|
2001
|
3
|
ROB between Nuzvid and Vatluru
|
Km 477/3-4
|
2001
|
4
|
RUB between Pakala and Putalapattu
|
RUB No. 632
|
2002
|
5
|
RUB 1A at Alugadda Bavi - Secunderabad
|
NIL
|
2002
|
6
|
RUB No. 564 at Chittoor
|
NIL
|
2003
|
7
|
ROB at Ambadnaka
|
In lieu of LC No.77
|
2003
|
8
|
ROB at Tirupati
|
NIL
|
2005
|
Note: * Rly. Portion compeleted. Approaches still in progress.
|
Unique Constructions
III rd Godavari Bridge at Rajahmundry
The 28 spans of 97.552m unique bow-string girder bridge started in 1981, was completed and opened for passenger traffic on 12.03.1997.
Bogada Tunnel
The 1565 m long Bogada Tunnel – the longest tunnel in SCR – was constructed in record time of 15 months, from Nov 1994 to Jan 1996, on the diverted portion of the Nandyal – Giddalur G.C. Project.
Krishna Bridge
The 12 x 89.90 m Steel girder between Krishna Canal and Vijayawada is the 3rd one bridging the river and plays a vital role in traffic movement between North & South India. Construction was started in Sept.2000 and commissioned for traffic in April, 2004.
Projects in progesss
PROJECTS IN PROGRESS
|
Length in Kms
|
New lines
| |
Karimnagar - Nizamabad
|
142.35
|
Nandyal - Yerraguntla
|
126.00
|
Munirabad - Mahabubnagar
|
231.50
|
Gulbarga - Bidar
|
106.60
|
Gadwal - Raichur
|
58.80
|
Kakinada - Pithapuram
|
21.50
|
Kotipalli - Narsapur
|
57.21
|
Macherla - Nalgonda
|
81.60
|
TOTAL
|
825.56
|
Gauge Conversion
| |
Mudkhed - Kinwat
|
117.00
|
Akola - Purna
| 210.00 |
TOTAL
|
608.26
|
Doubling
| |
Patch doubling of Gooty - Renigunta
|
192.04
|
Guntakal - Bellary
|
49.00
|
Raichur - Guntakal
|
81.00
|
TOTAL
|
322.04
|
Road Safety Works (ROB/RUB)
| |
Jamai Osmania ROB in lieu of LC No.2-E*
| |
SC - DNC ROB in lieu of LC No.1 near Sitafalmandi.*
| |
Kazipet yard - ROB in lieu of LC No.59-A
| |
Guntur - Tenali ROB in lieu of LC No.250
| |
Pithapuram ROB in lieu of LC No.429
| |
Anakapalli - Thadi ROB in lieu of LC No.487
| |
Bellampalli ROB in lieu of LC No.62
| |
Gudur - Oduru ROB in lieu of LC No.99-A & 99-B
| |
Tirupati - Renigunta RUB in lieu of LC No.105
| |
Anantapur yard ROB in lieu of LC No.128-A
| |
Anaparthi station yard ROB in lieu of LC No.413
| |
Budwel - Umdanagar ROB in lieu of LC No.
| |
Chiluvur - Pedavadlapudi ROB in lieu of LC No.301.
| |
Kazipet - Balharsha ROB in lieu of LC No.41 near Peddapalli
| |
Nuzvid - Vatlur ROB in lieu of LC No.336
| |
Ongole - Karavadi ROB in lieu of LC No.208
| |
Safilguda ROB in lieu of LC No.254
| |
Sanathnagar - Moula-ali ROB in lieu of LC No.3-M
| |
Sirpurkagaznagar yard ROB in lieu of LC No.77
| |
Tadi - Duvvada ROB in lieu of LC No.490
| |
Adoni (Isivi station yard) ROB in lieu of LC No.198.
| |
Ayyappagudi - Nellore ROB in lieu of LC No.110
| |
Bapatla - Appikatla ROB in lieu of LC No.257
| |
Jammikunta station yard ROB in lieu of LC No.21
| |
Kankaragunta (Guntur) ROB in lieu of LC No.313
| |
Matwada (Warangal) - Chintapalli ROB in lieu of LC No.63
| |
Nellore (Kovur gate) ROB in lieu of LC No.119
| |
Ramagundam - Peddampet ROB in lieu of LC No.51.
| |
Tandur station yard ROB in lieu of LC No.14-T
| |
Tanuku - Kaldhari ROB in lieu of LC No.152
| |
Yelgur - Nekkonda ROB in lieu of LC No.71
| |
Vatlur - Powerpet RUB in lieu of LC no. 346
| |
Yadgiri - Thangundi ROB at Rly.Km 635/1-2
| |
Powerpet-Eluru ROB in lieu of LC No. 349
| |
Rayanapadu Road ROB in lieu of LC No. 315A
| |
Deposit works
| |
ROB in Mudkhed Yard in lieu of LC No.156
| |
Nanded and Pathrod (H) ROB at Km 353/15-16
| |
Bimbari -Bhokar stations - ROB at Km 20/4-5
| |
Ambad - Naka ROB at Km 174/14-15 LC No.77
| |
Chikaltana - Karmad ROB at Km 126/5-6
| |
Note: * Rly. Portion compeleted. Approaches still in progress.
| |
SURVEYS:
| |
RETS for Third line bet. Ballarshah-Kazipet Doubling
| |
RETS for Third line bet. Kazipet - Vijayawada - Gudur Doubling
| |
RETS for Jadcherla - Nandyal
| |
RETS: Reconnaisance Engg. -cum-Traffic Survey
| |
PETS: Preliminary Engg. -cum-Traffic Survey
|